Skip to content

Aion ES

Sedan · BEV · announced

Voltranker score

76.9/100

Methodology v1.1

Standard

Ex-factory PKR 1.54 Cr
Real-world range
320 km
Battery
74 kWh
Max DC charge
140 kW
Seats
5

The breakdown

How this score was built

Every pillar is derived from measured raw data against published threshold rules (Value is relative within this price tier). The composite is the weighted sum. No pillar score, and no final score, is typed in by hand.

Challenge this score

Value

22% of composite

92

Value is scored relative to the other cars in the same price tier: lower cost per kilometre of real-world range scores higher. It is never typed in.

  • Ex-factory price (PKR): PKR 1.54 Cr
  • Real-world range (km): 320
  • Cost per km of real-world range in this tier: PKR 48,125

Reliability

22% of composite

80

Derived from Vehicle warranty (years) against the published threshold table. No editor typed this number.

  • Measured Vehicle warranty (years): 5
  • Matched threshold: ≥ 5 → band score 8 / 10
  • Stored pillar score: 80.0 / 100

Performance

18% of composite

60

Derived from Real-world range (km) against the published threshold table. No editor typed this number.

  • Measured Real-world range (km): 320
  • Matched threshold: ≥ 250 → band score 6 / 10
  • Stored pillar score: 60.0 / 100

After-Sales

12% of composite

60

Derived from Service centres against the published threshold table. No editor typed this number.

  • Measured Service centres: 11
  • Matched threshold: ≥ 8 → band score 6 / 10
  • Stored pillar score: 60.0 / 100

Company Trust

12% of composite

100

Derived from Years in the Pakistan market against the published threshold table. No editor typed this number.

  • Measured Years in the Pakistan market: 19
  • Matched threshold: ≥ 15 → band score 10 / 10
  • Stored pillar score: 100.0 / 100

Charging Network Compatibility

5% of composite

100

Derived from Max DC charge (kW) against the published threshold table. No editor typed this number.

  • Measured Max DC charge (kW): 140
  • Matched threshold: ≥ 100 → band score 10 / 10
  • Stored pillar score: 100.0 / 100

Pakistan Road Suitability

5% of composite

50

Derived from Ground clearance (mm) against the published threshold table. No editor typed this number.

  • Measured Ground clearance (mm): 155
  • Matched threshold: ≥ 140 → band score 5 / 10
  • Stored pillar score: 50.0 / 100

Market Sentiment

4% of composite

40

Derived from Owner survey score against the published threshold table. No editor typed this number.

  • Measured Owner survey score: 51
  • Matched threshold: ≥ 40 → band score 4 / 10
  • Stored pillar score: 40.0 / 100

Weighted composite

76.9

Score history

Every change to any pillar is logged with the old value, the new value, who made it and when. This log cannot be edited or deleted.

No changes recorded since this vehicle was first scored. Every future edit appears here automatically.

Specifications

Full figures — Standard

As published by the manufacturer. Anything we have not been able to verify is left out rather than estimated.

Battery & charging

Battery
74 kWh
Real-world est.
320 km
Max DC charge
140 kW

Dimensions

Seats
5
Ground clearance
155 mm

On the road

What you actually pay

We do not hold a verified on-road estimate for this variant yet. Rather than publish a number we cannot source, this stays blank until we do.

Running cost

Against an equivalent petrol car

Consumption worked out
23.1 kWh/100km
Electricity at Rs 45/kWh
Rs 10,395/mo
Petrol at Rs 268/L
Rs 22,333/mo
You save Rs 11,938/mo

Based on 1,000 km a month, home AC charging, and a petrol car returning 12 km/L. Tariff and petrol price are site-wide values, updated centrally. Consumption is worked out from battery capacity and real-world range, because the manufacturer has not published a figure.

Open the cost calculator

Price history

How the price has moved

Every ex-factory price change we have recorded for this car, newest first.

Current price Rs 877,665

No price changes recorded since we started tracking on 30 September 2026.

Charging

Where this car can charge

No connector types recorded for this car yet.

Public network coverage

0%

of mapped public stations can charge this car — 0 of 8.

Also consider

Other cars

Ranked in the same tier, so these are the cars competing for the same buyer.